Here are some pictures from the Roof Framing Solutions Gallery showing:
- Roof Sections moved into location ready for assembly.
- Finished Custom Ceilings.
- As Built Finish Areas.
- Future Finished Areas.
- A Two-Story Bedroom With a bathroom under the Stairs to the Finished Attic Space.
- Radius Tails.
- Same 22,000 Square Foot House with Roof System Complete and Dried In after 9 days
- Organized stacks of Pre-cut Rafters ready to be moved.
- Custom Vaulted Ceilings.
- Radius Vaulted Ceilings.
- Future Storage Areas.
- New Addition of Free-Standing Stairs to New Finished Attic Space.
- Flatspot Roof with Skylight.
- Pre-set Roof Kneewalls / Double Kneewalls.
- 22,000 Square Foot House with Pre-cut Roof System already staged and ready to be moved into place. Note the size of the waste pile after cutting the roof and the jobsite condition with Smarter Material Management







































































































